Pre-bid Services Including Financial Analysis of BOT Projects
Introduction:
Pre-bid services are provided to estimate the likely project cost and the volume of tollable traffic to assess the likely revenue to be generated in the project road corridor. It assists our clients quote for a project.
Coverage/ Methodology:
The Pre-bid services include:
- Review of all available data and reports.
- Traffic Survey
- Classified traffic volume count.
- Origin Destination survey.
- Axle load survey.
- Intersection volume count.
- Speed and delay survey.
- Traffic demand estimate.
- Reconnaissance and alignment.
- Topographic survey.
- Investigation for bridge and structures.
- Preliminary design.
- Estimation of quantities and project cost estimates.
- Estimation of revenues and operation and maintenance cost.
Benefit:
It helps the concessionaire to quote for a particular project.